As of June 2020
Phase: Pre-Design

The City was awarded a $963,900 City Safety Program grant for design, right of way acquisition and construction of pedestrian safety improvements on Meridian Avenue N between N 155th Street and N 175th Street. The project has proposed to:

  • Re-channelize Meridian Avenue N to add a center turn lane within the project limits
  • Add a median island at the existing crosswalks at N 163rd Street and at N 170th Street
  • Add pedestrian activated flashing beacons at both crosswalks
  • Install streetlights at select intersections
  • Update curb ramps within the project limits to ADA compliance

Schedule

  • Spring 2020: Public Outreach
  • Summer 2020: Preliminary design
  • Fall 2021: Final design
  • Spring 2022: Construction

Overview and History

The City’s 2018 Traffic Report indicated that 39 percent of the 46 injury and fatal collisions in Shoreline between 2010 and 2016 involved a pedestrian, and that, as a percentage of overall injury collisions the number of non-motorized (pedestrian and bicycle) collisions is rising. In mid-2018, staff sought grant funding for improvements on a number of the identified segments, focusing on reducing the numbers of pedestrian and bicycle injury collisions.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer