Status
As of September 2026
Phase: Substantial completion
Project Summary
This project will replace the existing pump station, rehabilitate the existing detention pond, and install other minor improvements to the Pump Station 30 (PS 30) facility. The new pump station will include a new wet well with two new submersible pumps, new control panels, communications systems, and other minor electrical and control improvements. Improvements to the existing detention pond include new inlet and outlet pipe, removing accumulated solids, improving access ramps, and adding a pre-treatment structure.
The map below shows the location of Pump Station 30 in relation to all of Shoreline.
Schedule
Overview and History
Pump Station 30 is one of eight surface water pump stations currently operating in the City and has been in operation since 1992. It detains runoff from 43 acres of commercial and residential land to prevent flooding and move water to downstream piping that eventually flows to Thornton Creek. Many parts of the pump station are past their intended operational life and need replacement. It has been identified in multiple studies as a candidate for replacement.
A Stormwater Pump Station Condition and Capacity Assessment was completed in 2016. This report evaluated the City’s eight existing stormwater pump stations, identified various deficiencies, and recommended general improvements for each station. It found Pump Station 30 needed new pumps, valve vaults, valves, and controls, improvements to the existing wetwell, improved electrical and communications systems, and minor site improvements.
In early 2019, the City put out a Request for Qualifications (RFQ) to hire a design consultant to design consistent pump station improvements across all eight of the City’s existing surface water pump stations. After review of multiple firm proposals, BHC Consultants, LLC was selected. In mid-2019, BHC began the first phase of their scope, which was to assemble a Stormwater Pump Station and SCADA Improvements Preliminary Design Report. This report verified and expanded on the findings of the 2016 Conditions Assessment, provided telemetry design recommendations for all stations, and provided preliminary design for the two pump stations requiring full replacement, including PS-30. The recommended improvements for PS 30 include replacing the existing wet well and pumps, installing new control panels, adding a pre-treatment structure, and rehabilitating the existing detention pond by removing solids, improving the maintenance ramps, and replacing inlet and outlet piping. A new force main in the public right-of-way is also recommended. Frontage improvements along NE 170th Street are also recommended if funding allows.
Tree Impacts
This project requires the removal of 1 tree. We will replant 2-3 replacement trees.
Funding
King County Flood Control District (KCFCD) has contributed with a Flood Reduction Grant as well as the KCFCD Sub-Regional Opportunity Fund.
The remaining spending will be covered by local funds.
Community Outreach
May 2023: The City mailed a Construction Notification Postcard to residents within 500 feet of the project site.
April 2025: The City mailed a Construction Notification Postcard to residents within 500 feet of the project site.
Translations
English: If you would like to communicate with the City of Shoreline or review a document in another language, please send your request along with your contact information to clk@shorelinewa.gov or call 206-801-2700. Translated materials are provided free of charge.
Amharic: ከCity of Shoreline ጋር ለመገናኘት ከፈለጉ ወይም አንድን ሰነድ በሌላ ቋንቋ ለማየት ከፈለጉ፣ ጥያቄዎን ከዕውቅያ መረጃዎ ጋር በማድረግ ወደ clk@shorelinewa.gov ኢሜይል ይላኩ ወይም ወደ 206-801-2700 ይደውሉ። የተተረጎሙት መረጃዎች ያለክፍያ ይቀርባሉ።
Arabic: إذا كنت ترغب في التواصل مع City of Shoreline أو ترغب بمراجعة مستند بلغة أخرى، يُرجى إرسال طلبك مصحوبًا بمعلومات التواصل معك عبر clk@shorelinewa.gov أو اتصل بنا على 206-801-2700. تقدم المواد المترجمة مجانًا.
Chinese (Simplified): 如果您想与 City of Shoreline 进行交流或查看其他语言版本的文档,请将您的请求连同您的联系信息发送到 clk@shorelinewa.gov 或致电 206-801-2700。翻译材料免费为您提供。
Chinese (Traditional): 如果您想與 City of Shoreline 進行交流或檢視以另一種語言提供的文件,請將您的請求連同您的聯絡資訊發送到 clk@shorelinewa.gov 或請致電 206-801-2700。翻譯資料免費為您提供。
Japanese: City of Shorelineとのやり取りや、文書を別の言語でご覧になることをご希望の場合は、ご希望内容と連絡先情報を clk@shorelinewa.gov までメールでお送りいただくか、 206-801-2700 までお電話ください。翻訳資料は無料で提供しています。
Khmer: ប្រសិនបើអ្នកចង់ទំនាក់ទំនងជាមួយ City of Shoreline ឬពិនិត្យឯកសារជាភាសាផ្សេងទៀត សូមផ្ញើសំណើរបស់អ្នករួមជាមួយនឹងព័ត៌មានទំនាក់ទំនងរបស់អ្នកទៅកាន់ clk@shorelinewa.gov ឬទូរស័ព្ទទៅ 206-801-2700 ។ សម្ភារៈបកប្រែត្រូវបានផ្តល់ជូនដោយឥតគិតថ្លៃ។
Korean: City of Shoreline에 연락하고 싶거나 다른 언어로 된 문서를 검토하려면 연락처 정보와 함께 요청서를 clk@shorelinewa.gov 로 제출하거나 206-801-2700 번으로 전화해 주십시오. 번역본은 무료로 제공됩니다.
Russian: Если вы хотите связаться с представителями City of Shoreline или ознакомиться с документом на другом языке, отправьте запрос вместе со своими контактными данными на адрес clk@shorelinewa.gov или позвоните по номеру 206-801-2700. Переведенные материалы предоставляются бесплатно.
Spanish: Si desea comunicarse con la City of Shoreline o consultar un documento en otro idioma, envíe su solicitud junto con su información de contacto a clk@shorelinewa.gov o llame al 206-801-2700. El material traducido se entrega sin cargo.
Tagalog: Kung nais ninyong makipag-ugnayan sa City of Shoreline o sumuri ng dokumento sa ibang wika, mangyaring ipadala ang inyong kahilingan kasama ang inyong impormasyon sa pakikipag-ugnayan sa clk@shorelinewa.gov o tumawag sa 206-801-2700. Ang mga isinaling kagamitan ay ipinagkakaloob nang walang bayad.
Tigrinya: ምስ City of Shoreline ክትዘራረቡ ወይ ድማ ሰነዳትኩም ብካልእ ቋንቋ ክትሪኡ ምስ እትደልዩ፣ ጠለባትኩም ምስ መራኸቢ ሓበሬታኹም ናብ clk@shorelinewa.gov ለኣኹ ወይ ድማ ብቑፅሪ ስልኪ 206-801-2700 ደዉሉ። ዝተተርጎመ ሓበሬታ ብነጻ ይቐርብ።
Vietnamese: Nếu bạn muốn liên hệ với City of Shoreline hoặc xem tài liệu bằng ngôn ngữ khác, vui lòng gửi yêu cầu cùng với thông tin liên hệ của bạn đến clk@shorelinewa.gov hoặc gọi 206-801-2700. Các tài liệu dịch thuật được cung cấp miễn phí.