This checklist applies to existing Emergency Responder Radio Coverage Systems in an existing building and
covers the replacement of parts and or decommissioning of a system as needed to comply with PSERN
standards and agreements. These projects must comply with the International Fire Code, NFPA 72/1221, PSERN requirements, FCC regulations, and the Shoreline Municipal Code. One fire permit is required for each separate system. If this does not apply to your project, then please refer to the ERRCS New System permit requirements.
Please review Shoreline Municipal Code (SMC) 15.05.050 to learn more about the City’s amendments to the International Fire Code. If you have questions about the City’s fire code or submittal requirements, please email the Shoreline Fire Marshal’s Office at fmo@shorelinefire.com; their staff can walk you through the requirements.
How to Apply
Apply for this permit online at the City of Shoreline's eTRAKiT permitting portal. Once you are logged into your account, select Apply/New Permit from the left-hand sidebar and select the following permit type from the drop-down menu: Pre-Intake Record.
Once PIN requests are submitted, the rest of the intake process is facilitated by a permit technician. A permit technician will send further instructions by email to complete the process.
Required Documents
In addition to the checklist below, any item listed in NFPA 72 7.1 may be required before a permit is accepted for review as per the fire code official.
- Permit Application and Critical Area Worksheet
- Submittal Fee
- Please reference the City's fee schedule for current application fees.
- Construction Drawings – scaled drawings showing the proposed work.
- Site Plan
- Cut Sheets
- Set of manufacturers cut sheets on all equipment, including the National Electric Manufacturer’s
Association (NEMA)-4 cabinet, battery backup (if using battery backup as standby power), and
other equipment being installed. Clearly mark the specific model of equipment used.
- Set of manufacturers cut sheets on all equipment, including the National Electric Manufacturer’s
- Letter of approval of the design from the Puget Sound Emergency Radio Network (PSERN)
- Proof of a License
- Must be valid FCC-issued general radio operator’s license.
- A certification of in-building system training issued by a nationally recognized
organization/school or by the manufacturer of the equipment being installed.
- Scope of work being completed and reasons for upgrade and or decommissioning of current system.
Additional Permits (Possibly Required)
These are additional permit that may be required to accompany your project application depending on your scope of work.
- Electrical Permit
- Modifications to, or installation of electrical circuits and fixtures.
- Permits are through Washington State Labor & Industries (L&I), not through the City of Shoreline.