Industrial discharge permit applications are required when industrial process wastewater or dewatering activities from a permitted job site are intended to be discharged from a site into the City’s wastewater system. Examples include:

  • Flushing potable water systems.
  • Construction site dewatering.
  • Groundwater treatment onsite prior to discharge to the City’s wastewater system. For example, dry cleaner site remediation and Point Wells oil contamination site cleanup.
  • Long term connection of oil water separators. For example, King County bus barn and transfer station and car washes.
  • Commercial activities producing effluents considered to be harmful to the wastewater system. For example, brewery, food production facility and any discharge other than black water. 

Please review Division 4 of the City’s Engineering Development Manual (EDM) to learn more about the City’s wastewater requirements. If you have questions about the City’s code or submittal requirements, please submit an Engineering Development Question Form to connect with a development review engineer who can walk you through the requirements. 

How to Apply

Apply for this permit online at the City of Shoreline's eTRAKiT permitting portal. Once you are logged into your account, select Apply/New Permit from the left-hand sidebar and select the following permit type from the drop-down menu: Pre-Intake Record.

Once PIN requests are submitted, the rest of the intake process is facilitated by a permit technician. A permit technician will send further instructions by email to complete the process. 