General Wastewater Permit

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

This checklist covers the following general wastewater‑related permits that don’t fall under the developer extension agreement, industrial discharge, or new sewer connection:

  • Side sewer repair: for side sewer repairs on private property located within an existing public easement or within the public right-of-way.
    • Note: side sewer repairs on private property that are not located within a public easement are treated a over-the-counter permits. They can be applied for directly online and are usually processed within 24 - 48 hours. 
  • Cap‑offs: permanently closing and abandoning an existing sewer service.
  • Core main: drilling into the public sewer main to create a new service connection point.

Please review Division 4 of the City’s Engineering Development Manual (EDM) to learn more about the City’s wastewater requirements. If you have questions about the City’s code or submittal requirements, please submit an Engineering Development Question Form to connect with a development review engineer who can walk you through the requirements. 

How to Apply

Apply for this permit online at the City of Shoreline's eTRAKiT permitting portal. Once you are logged into your account, select Apply/New Permit from the left-hand sidebar and select the following permit type from the drop-down menu: Pre-Intake Record.

Once PIN requests are submitted, the rest of the intake process is facilitated by a permit technician. A permit technician will send further instructions by email to complete the process. 

Required Documents 

Additional Documents (Possibly Required)