Twin Ponds Park Turf & Field Light Replacement Project

Print
Press Enter to show all options, press Tab go to next option

Status

As of October 2017
Phase: Construction

A 2014 condition report was completed by field turf and field lighting experts that concluded that the turf and lights have exceeded their useful life and recommended replacement. 

 Location of the Twin Ponds Park Turf & Field Light Replacement Project

Project Scope

  • Replace synthetic field turf and sand/rubber infill with new synthetic turf and cork/sand infill
  • Replace the existing wooden poles and light fixtures with new metal poles and light fixtures
  • Provide new parking lot lighting at the north parking lot and add pedestrian path lighting from the north parking lot to the athletic field