Status

As of June 2019
Phase: Construction

NE 175th Street Pavement Preservation Project Map

The contract for construction is in the process of being executed.  A pre-construction meeting was held on May 30, 2019. Construction is expected to begin in early July.

Overview and History

As part of the City's pavement preservation program, this project will provide pavement rehabilitation along NE 175th Street between I-5 and 15th Avenue NE. The primary goal is to improve the condition of the pavement by resurfacing it with an asphalt overlay and rebuilding curb ramps, sidewalks, and driveways for compliance with the Americans with Disabilities Act (ADA).

Following the September 2018 Open House, staff reviewed the feedback received and conducted a technical analysis of the corridor and the proposed rechannelization. Based on a combination of factors, the city has decided not to re-channelize the corridor between 5th Avenue NE and 15th Avenue NE to the proposed three lanes.

Modifications are planned at the intersection of 15th Avenue NE and NE 175th Street, providing an additional eastbound right-turn lane. This modification will significantly improve the operation of the intersection, reduce existing delays, and decrease queues extending from the intersection.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer