Engineering Standards

Print
Press Enter to show all options, press Tab go to next option

Engineering Development Manual

The Engineering Development Manual (EDM) is a supplement to the Shoreline Municipal Code. The EDM provides information to help with the processes and requirements that apply to private development.

The EDM has four divisions:

Division 1:
Administration - Information about permits
Division 2:
Right-of-Way - Standards and other information about development within the City right-of-way
Division 3:
Surface Water - Policies and design standards about surface/storm water
Division 4: Construction and Inspection - Information about construction and inspection in the City right-of-way

 
The current EDM can be found here: Engineering Development Manual.

The current EDM is effective starting June 13, 2017. All permit applications completed after this date must meet the standards of the current EDM.

Standard Plans and Notes

The City publishes the standard details and notes in the links below.

Future Revisions

The draft version of the 2019 EDM is now available for review.  Please share your comments on the Draft 2019 EDM by November 1, 2018, using the Online EDM Feedback Form.

Starting in 2018, the City plans to update the EDM every year. The EDM will be updated to incorporate changes in development code, meet current development needs, and revise formatting.

The estimated timeline for the annual EDM update process is:

  • July 1st: Deadline for public comments on the current EDM.
  • October 1st: A DRAFT updated EDM is published here for additional comment.
  • November 1st: Deadline for public comments on the DRAFT updated EDM.
  • January 1st: The FINAL updated EDM is published here and becomes effective.

Previous Versions

Old versions of the EDM can be found here:

2014 Engineering Development Manual

The table below summarizes key revisions to the previous version of the EDM. This is not a full list of all changes.

Chapter/ Section

Revision

7.9 Illumination

Added street lighting requirements/standards

Chapter 8 – Transportation Impact Analysis

Revised and details moved to the appendix

Chapter 10 Access Management

Revisions and re-organization of some information. Key changes include clarification on consolidated access, driveway spacing

Chapter 11 Access Design

Clarifications on driveway placement

Chapter 17 Traffic Control Devices

Added section on standards and requirements for traffic signals

Division 3 – Surface Water

Multiple provisions for compliance with NPDES permit

Revised flow control standard for Boeing Creek Basin

Appendix C – Surface Water Report Guidelines

Updated for consistency

Appendix E - Transportation Impact Analysis

Revised and clarified requirements

Appendix H – Infiltration Test Method

Updated Appendix to be consistent with Department of Ecology methods

Appendix J – Street Lighting Level Criteria

New appendix for street lighting

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer